Timelines depend on size, design, funding and approvals. Here is what shapes your schedule and how to keep it on track.
One of the first questions owners ask is, “When can we move in?” Timelines vary with scope and size, but most residential projects, from design through completion, take between 6 and 14 months.
The usual order of work
- Design and drawings: architectural and structural plans are prepared
- Approval: your plans are submitted for building approval (see how to get building approval in Enugu State)
- Foundation and structure: the building frame goes up
- Roofing: the building is covered (see flat vs pitched roofs)
- Finishing: plastering, tiling, electrical, plumbing, painting and fittings
What affects the timeline
- Size and complexity: a large duplex takes longer than a compact bungalow
- Funding: delays in payment are a leading cause of stalled projects
- Design completeness: unclear drawings cause stoppages and changes
- Soil and site conditions: weak soil can require extra foundation work
- Weather: heavy rain slows some activities
- Changes during construction: late changes add time and cost
How to avoid delays
- Finalise your design before work starts
- Have your funding plan ready for each stage
- Choose a team that provides a clear schedule, as we do after your first consultation
- Avoid unnecessary changes once construction begins