The building is only part of the bill. These are the costs that catch owners off guard halfway through a project.
Many house projects stall because the owner budgeted for the structure and forgot everything around it. Plan for these items from day one.
Before construction
- Land survey and soil test. Both protect you from expensive foundation surprises. See our land surveying service.
- Building plan and engineering drawings. Learn more in our guide to what a building plan costs.
- Approvals and permits. Fees and requirements vary by state. Read our guide to building approval in Enugu State.
- Site clearing and levelling.
During construction
- Transport and storage of materials.
- Water and temporary power for the site.
- Skilled labour, supervision and site security.
- Changes made after work has started.
Often missed completely
- Fencing and gate
- Landscaping and driveway
- Borehole, overhead tank and septic tank
- Electricity connection and power backup
- Furnishing, curtains and kitchen fittings
In our budget-based house guides, these items are deliberately excluded because owners usually fund them separately.
Keep a contingency
Prices of materials can change during a long project. Setting aside a contingency amount helps you avoid stopping work halfway.
Avoid other common errors by reading our guide on 7 costly mistakes to avoid before starting your building project.